Dissolvable plugs frequently encounter the following challenges in extended laterals:
Deployment
Dissolving process is triggered as soon as the plug enters the well:
• Longer pump down time
• Longer exposure
• Longer idle time
• Higher risk of failure
Isolation
Critical components may be affected by long exposure during pump down, resulting in unreliable anchoring and isolation.
Dissolving
Some plugs are designed to slow down dissolution for pump down and fracking, but it also leads to problems for post-frac intervention.
Vertechs has developed the WIZARD ZERO Large-Bore Dissolvable Collet, designed for both high and low temperature applications and capable of withstanding pressures up to 10,000 psi, to address the inherent challenges of traditional dissolvable plugs. After stimulation is completed, the well can be immediately flowed back through the ZERO's large inner diameter (ID), preventing downhole debris or sand from accumulating. This design eliminates the need for clean-out runs, significantly reducing intervention costs:
• Fast pump down
• Isolation enhancing mechanism
• Adaptability for different well conditions
• Predictable dissolution
Optimize Your Operations Today
Discover how Vertechs WIZARD ZERO Large-Bore Dissolvable Collet can optimize your operations and mitigate the challenges associated with traditional dissolvable plugs. Please reach out to us at engineering@vertechs.com.