Precision Well Control, Reimagined | Meet the Intelligent RCD at MEOS GEO 2025
Vision 2030 | Vertechs Group at KFUPM Career Fair Recognized for International Training Collaboration
CNAS-Certified: REALology Redefines Drilling Fluid Monitoring Accuracy
Case Study in JPT September 2025 Issue | Vertechs High-Expansion Dissolvable Plug for Casing-Deformation Challenges
Vertechs Dissolvable Plug Empowers Re-Fracturing in Mature Wells
REALology Intelligent Drilling Fluid Online Monitoring System Facilitates Smart Drilling Rig Upgrades
From 4th of March to 24th of April, 2017. 27 stage frac with Phantom Hybrid Plugs was successfully wrapped up in Sichuan Shale Gas Project with zero (0) failure. Average 2000 m3 frac fluids were pumped for each stage at a pump rate over 12 m3/min, and weRead more
Vertechs successfully achieved a challenging triple cement plug operation (wellbore, annulus A&B) in a one-time procedur...Read more
Vertechs, a primary service provider for cementing in this IOC shale gas project, successfully spotted a reservoir cemen...Read more
8th Dec, 2016, in Sichuan Shale Gas Project, China, VERTECHS WIZARD dissolvable bridge plug was successfully set, follow...Read more
Vertechs is a major cementing service provider in southwest China’s shale gas play. During the increased focus and activ...Read more
After the debut of Phantom big-bore bridge plugs in China in 2014, Vertechs Phantom bridge plugs have been recognized as...Read more
Initiated September 2016, the VSA Card is ready to play its role in the Vertechs QHSE system. It will record all the asp...Read more